Onshore wind project 97, Judith Basin County

Onshore wind project 97, Judith Basin County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Judith Basin County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
97
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
230kV Line from Judith Gap Auto to Great Falls.
Location
Judith Basin County, Montana
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
26 August 2008
Proposed online date
December 2010

Location

Marker shows the centre of Judith Basin County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Judith Basin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem