Solar project 248, Carbon County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Carbon County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 248
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Fromberg Substation, Fromberg, MT
- Location
- Carbon County, Montana
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study System Impact-Re-Study
- Queue status
- Withdrawn
- Entered queue
- 29 February 2016
- Proposed online date
- November 2016
Location
Marker shows the centre of Carbon County; the queue data does not give exact sites.
Other requests in Carbon County
- Onshore wind project 542, Carbon CountyOnshore wind Β· 240 MW Β· built
- Hydro project 129, Carbon CountyHydro Β· 0.5 MW Β· built
- Onshore wind project 24, Carbon CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project 373, Carbon CountySolar Β· 79.8 MW Β· withdrawn
- Solar project 266, Carbon CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 245, Carbon CountySolar Β· 3.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem