Hydro project 345-B, Washington County

Hydro project 345-B, Washington County is a 3.3 MW hydro request withdrawn in the West interconnection queue, in Washington County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
345-B
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Coleman - Toquerville line
Location
Washington County, Utah
Technology
Hydro: 3.3 MW
Total requested
3.3 MW
Service type
Network resource (NRIS)
Study phase
REMOVED-LACK OF PROGRESS
Queue status
Withdrawn
Entered queue
15 July 2010
Proposed online date
October 2010

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Washington County