SOLAR · WESTSolar project 737, Washington County
Solar project 737, Washington County is a 122 MW solar request built and operating in the West interconnection queue, in Washington County, Utah, connecting to PacifiCorp.
Request details
- Queue ID
- 737
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Cove Mountain Solar 2, LLC
- Connection point (POI)
- Enterprise Valley substation
- Location
- Washington County, Utah
- Technology
- Solar: 122 MW
- Total requested
- 122 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA signed 6/25/18
- Queue status
- Operational
- Entered queue
- 15 April 2016
- Agreement signed
- 25 June 2018
- Proposed online date
- October 2020
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar + storage project C1-39, Washington CountySolar + storage · 300 MW · agreement signed
- Gas project S0035, Washington CountyGas · 300 MW · in study
- Battery storage project S0033, Washington CountyBattery storage · 122 MW · in study
- Battery storage project S0014, Washington CountyBattery storage · 58.0 MW · in study
- Solar project 641, Washington CountySolar · 58.0 MW · built
- Other project 548, Washington CountyOther · 6.0 MW · built
- Solar + storage project PIS035, Washington CountySolar + storage · 300 MW · withdrawn
- Solar project C3-113, Washington CountySolar · 240 MW · withdrawn
- Hydro project 337, Washington CountyHydro · 174 MW · withdrawn
- Onshore wind project 35, Washington CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project 474, Washington CountyOnshore wind · 80.0 MW · withdrawn
- Onshore wind project 714, Washington CountyOnshore wind · 52.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem