United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project PIS035, Washington County
Solar + storage project PIS035, Washington County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in Washington County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- PIS035
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Sigurd-Red Butte transmission line
- Location
- Washington County, Utah
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 5 May 2023
- Proposed online date
- December 2026
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar + storage project C1-39, Washington CountySolar + storage Β· 300 MW Β· agreement signed
- Gas project S0035, Washington CountyGas Β· 300 MW Β· in study
- Battery storage project S0033, Washington CountyBattery storage Β· 122 MW Β· in study
- Battery storage project S0014, Washington CountyBattery storage Β· 58.0 MW Β· in study
- Solar project 737, Washington CountySolar Β· 122 MW Β· built
- Solar project 641, Washington CountySolar Β· 58.0 MW Β· built
- Other project 548, Washington CountyOther Β· 6.0 MW Β· built
- Solar project C3-113, Washington CountySolar Β· 240 MW Β· withdrawn
- Hydro project 337, Washington CountyHydro Β· 174 MW Β· withdrawn
- Onshore wind project 35, Washington CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project 474, Washington CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 714, Washington CountyOnshore wind Β· 52.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem