United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Texas (2023 requests) β€” page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown36979.0 GW
Active in queue79.0 GW369 requests
Agreement signed25.0 GW108 requests
Withdrawn11324.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

369 requests Β· page 8 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Pamplona Solar
Solar + storage Β· Karol Solar III
42.4 MWIn study Austin, TXERCOT Aug 2023target 2028
Weathervane Storage SLF
Battery storage
32.5 MWPaused / redesign Montague, TXERCOT Aug 2023
Meridian BESS
Battery storage Β· Navitas Energy- Meredian BESS
31.2 MWIn study Bosque, TXERCOT Mar 2023target 2027
NET Power Demonstration plant
Gas Β· NET Power LLC
25.5 MWIn study Harris, TXERCOT Dec 2023target 2027
CPS Energy AvR1CT2 Rotor Replacement
Gas Β· CPS Energy
23.2 MWIn study Bexar, TXERCOT Oct 2023target 2025
Buzzi Maryneal Wind Project
Onshore wind Β· Buzzi Unicem USA
18.0 MWIn study Nolan, TXERCOT Oct 2023target 2026
Texas Gulf Sulphur Repower
Gas
16.1 MWPaused / redesign Wharton, TXERCOT Jul 2023
Stephens Ranch Wind Repower
Onshore wind Β· Stephens Ranch Wind Energy, LLC
12.4 MWIn study Borden, TXERCOT Jun 2023target 2027
Clutch City Storage II SLF
Battery storage
11.3 MWPaused / redesign Brazoria, TXERCOT Feb 2023
Panther Creek 1 Repower
Onshore wind Β· Panther Creek Wind Farm I&II, LLC
11.0 MWIn study Glasscock, TXERCOT Jun 2023target 2026
Damon BESS 2
Battery storage Β· PR DAMON, LLC
10.0 MWAgreement signed Brazoria, TXERCOT May 2023target 2026
Wildhorse POD Solar
Solar Β· Highpeak Solar, LLC
10.0 MWPaused / redesign Howard, TXERCOT Oct 2023target 2026
Harris Spencer BESS
Other Β· Harris Spencer BESS, LLC
10.0 MWPaused / redesign Harris, TXERCOT Mar 20232025
Cedro Hill Wind Repower
Onshore wind Β· CEDRO HILL WIND LLC
9.9 MWAgreement signed Webb, TXERCOT Sep 2023target 2026
Hidden Lakes BESS
Battery storage Β· SBESS TX 6 LLC
9.9 MWAgreement signed Galveston, TXERCOT Jun 2023target 2026
Gears BESS
Battery storage Β· Regis Gears-Harris LLC
9.9 MWAgreement signed Harris, TXERCOT Jun 2023target 2026
Panther Creek 2 Repower
Onshore wind Β· Panther Creek Wind Farm I&II, LLC
8.0 MWIn study Glasscock, TXERCOT Jun 2023target 2026
CPS Rio Nogales CT301 Rotor Replacement
Gas Β· CPS Energy
3.1 MWAgreement signed Guadalupe, TXERCOT Jul 2023target 2025
Champion Wind Repower
Onshore wind Β· Champion Wind Farm, LLC
0.3 MWAgreement signed Nolan, TXERCOT Sep 2023target 2025
Page 8 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)