United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Texas (2023 requests) β page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pamplona Solar Solar + storage Β· Karol Solar III |
42.4 MW | In study |
| Weathervane Storage SLF Battery storage |
32.5 MW | Paused / redesign |
| Meridian BESS Battery storage Β· Navitas Energy- Meredian BESS |
31.2 MW | In study |
| NET Power Demonstration plant Gas Β· NET Power LLC |
25.5 MW | In study |
| CPS Energy AvR1CT2 Rotor Replacement Gas Β· CPS Energy |
23.2 MW | In study |
| Buzzi Maryneal Wind Project Onshore wind Β· Buzzi Unicem USA |
18.0 MW | In study |
| Texas Gulf Sulphur Repower Gas |
16.1 MW | Paused / redesign |
| Stephens Ranch Wind Repower Onshore wind Β· Stephens Ranch Wind Energy, LLC |
12.4 MW | In study |
| Clutch City Storage II SLF Battery storage |
11.3 MW | Paused / redesign |
| Panther Creek 1 Repower Onshore wind Β· Panther Creek Wind Farm I&II, LLC |
11.0 MW | In study |
| Damon BESS 2 Battery storage Β· PR DAMON, LLC |
10.0 MW | Agreement signed |
| Wildhorse POD Solar Solar Β· Highpeak Solar, LLC |
10.0 MW | Paused / redesign |
| Harris Spencer BESS Other Β· Harris Spencer BESS, LLC |
10.0 MW | Paused / redesign |
| Cedro Hill Wind Repower Onshore wind Β· CEDRO HILL WIND LLC |
9.9 MW | Agreement signed |
| Hidden Lakes BESS Battery storage Β· SBESS TX 6 LLC |
9.9 MW | Agreement signed |
| Gears BESS Battery storage Β· Regis Gears-Harris LLC |
9.9 MW | Agreement signed |
| Panther Creek 2 Repower Onshore wind Β· Panther Creek Wind Farm I&II, LLC |
8.0 MW | In study |
| CPS Rio Nogales CT301 Rotor Replacement Gas Β· CPS Energy |
3.1 MW | Agreement signed |
| Champion Wind Repower Onshore wind Β· Champion Wind Farm, LLC |
0.3 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)355 Β· 76.0 GW
- SPP (Southwest Power Pool)13 Β· 2,738 MW
- West (non-ISO utilities)1 Β· 250 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)