United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Goodall Storage Battery storage |
510 MW | Withdrawn / abandoned |
| Solar Four Solar |
510 MW | Withdrawn / abandoned |
| Dolores Battery storage |
510 MW | Withdrawn / abandoned |
| Rex Solaris 2 Solar + storage |
509 MW | Withdrawn / abandoned |
| Rex Solaris 1 Solar + storage |
509 MW | Withdrawn / abandoned |
| Pinnacle Heights Solar + storage |
508 MW | Withdrawn / abandoned |
| Stockton Generation Gas |
508 MW | Withdrawn / abandoned |
| Carina Solar + storage |
508 MW | Withdrawn / abandoned |
| Cci Hybrid Power Gas |
508 MW | Withdrawn / abandoned |
| Flat Creek Solar + storage |
508 MW | Withdrawn / abandoned |
| Winoka Hybrid Solar Solar + storage |
508 MW | Withdrawn / abandoned |
| Midtown Canyon Gas Gas |
507 MW | Withdrawn / abandoned |
| Stirling Bridge Solar + storage |
507 MW | Withdrawn / abandoned |
| Goldspur Battery storage |
507 MW | Withdrawn / abandoned |
| Pinball Storage Battery storage |
507 MW | Withdrawn / abandoned |
| Bison Peak Battery storage |
506 MW | Withdrawn / abandoned |
| Ada Energy Storage Battery storage |
505 MW | Withdrawn / abandoned |
| Summiy Valley Battery storage |
505 MW | Withdrawn / abandoned |
| Spindle Energy Storage Battery storage |
504 MW | Withdrawn / abandoned |
| Commander Energy Storage Battery storage |
504 MW | Withdrawn / abandoned |
| Grand Lake Hybrid Solar Solar + storage |
504 MW | Withdrawn / abandoned |
| Etiwanda SCGT Expansion Gas |
504 MW | Withdrawn / abandoned |
| Moonstone Energy Storage Battery storage |
504 MW | Withdrawn / abandoned |
| Musketeers Solar 2 Battery storage |
502 MW | Withdrawn / abandoned |
| Alta 15 Onshore wind |
502 MW | Withdrawn / abandoned |
| Buonissimo Energy Battery storage |
502 MW | Withdrawn / abandoned |
| Chimera Solar + storage |
501 MW | Withdrawn / abandoned |
| Snakebite Solar + storage |
501 MW | Withdrawn / abandoned |
| Hydra Solar + storage |
501 MW | Withdrawn / abandoned |
| Greasewood Energy Storage II Battery storage |
500 MW | Withdrawn / abandoned |
| Avalon II Onshore wind |
500 MW | Withdrawn / abandoned |
| Solar + storage project Q70, Kern County Solar + storage |
500 MW | Withdrawn / abandoned |
| Solar project Q55, Kern County Solar |
500 MW | Withdrawn / abandoned |
| Desert Sapphire PV Solar |
500 MW | Withdrawn / abandoned |
| Geothermal project Q103, Inyo County Geothermal |
500 MW | Withdrawn / abandoned |
| Blythe Mesa Solar II Solar |
500 MW | Withdrawn / abandoned |
| Mortimer Solar Hybrid Solar + storage |
500 MW | Withdrawn / abandoned |
| Righteous Energy Storage Battery storage |
500 MW | Withdrawn / abandoned |
| Blythe Soleil Solar |
500 MW | Withdrawn / abandoned |
| San Vicente Energy Storage Facility Battery storage |
500 MW | Withdrawn / abandoned |
| Mesa Solar Solar |
500 MW | Withdrawn / abandoned |
| Gila Solar Solar |
500 MW | Withdrawn / abandoned |
| Oribi Battery storage |
500 MW | Withdrawn / abandoned |
| Monte Cristo Solar 4 Solar |
500 MW | Withdrawn / abandoned |
| Monte Cristo Solar 3 Solar |
500 MW | Withdrawn / abandoned |
| Cortes Battery storage |
500 MW | Withdrawn / abandoned |
| Re Austin Solar |
500 MW | Withdrawn / abandoned |
| Bear Mountains Pumped Storage Battery storage |
500 MW | Withdrawn / abandoned |
| Rough & Ready Island Energy Park Project Gas |
500 MW | Withdrawn / abandoned |
| Desert Sunlight PV III Solar |
500 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)