Grand Lake Hybrid Solar

Grand Lake Hybrid Solar is a 504 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJun 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1594
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Gates-Midway 230kV
Location
Kings County, California
Technology
Solar: 254 MW · Battery: 250 MW
Total requested
504 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
November 2023
Withdrawn
June 2022

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.