🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Etiwanda SCGT Expansion

Etiwanda SCGT Expansion is a 504 MW gas request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandonedDec 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
141
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Rancho Vista 500 kV Substation
Location
San Bernardino County, California
Technology
Gas: 504 MW
Total requested
504 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 November 2006
Proposed online date
June 2010
Withdrawn
December 2007

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem