United States › Grid › Interconnection queues › California

GAS · CAISO

Rough & Ready Island Energy Park Project

Rough & Ready Island Energy Park Project is a 500 MW gas request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandonedMay 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
281
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Loop Tesla-Stagg and Tesla-Eight Mile 230kV lines
Location
San Joaquin County, California
Technology
Gas: 500 MW
Total requested
500 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 December 2007
Proposed online date
December 2010
Withdrawn
May 2008

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem