🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in California, CAISO — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown376148.9 GW
Active in queue148.9 GW376 requests
Agreement signed81.1 GW213 requests
Withdrawn2,050551.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

376 requests · page 5 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Ciervo Mountain Hybrid
Solar + storage
255 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Sandrift Storage 1
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sandrift Storage 2
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
North Rosamond Solar
Solar + storage
253 MWAgreement signed Kern, CACAISO Jul 20102019
Greenwood Energy Storage
Battery storage
252 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2032
Zorin Storage
Battery storage
252 MWAgreement signed Alameda, CACAISO Apr 2021target 2034
Commerce Energy Storage
Battery storage
250 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2026
Commerce Energy Storage 2
Battery storage
250 MWIn study Los Angeles, CACAISO Apr 2020target 2026
Baylands Battery
Battery storage
250 MWAgreement signed San Mateo, CACAISO Apr 2021target 2030
Cormorant Storage
Battery storage
250 MWAgreement signed San Francisco, CACAISO Apr 2019target 2027
Windstar I Alternate
Wind + storage
240 MWAgreement signed Kern, CACAISO Apr 20062012
Midway Peaking
Gas
240 MWAgreement signed Fresno, CACAISO Jan 20052009
Sapphire Solar
Solar + storage
234 MWAgreement signed Riverside, CACAISO Apr 2020target 2034
Heartland 2
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Heartland 1
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Baldy Mesa
Solar + storage
225 MWAgreement signed San Bernardino, CACAISO May 2017target 2026
Allium Hybrid
Solar + storage
225 MWAgreement signed San Benito, CACAISO Apr 2021target 2030
Dorian Storage
Battery storage
214 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2034
Zeus BESS
Battery storage
214 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Weston Storage
Battery storage
214 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Frigatebird Storage
Battery storage
214 MWIn study San Diego, CACAISO Apr 2021target 2035
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Desert Jewel Storage
Battery storage
206 MWAgreement signed San Diego, CACAISO Apr 2021target 2029
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Fountain Wind
Onshore wind
206 MWAgreement signed Shasta, CACAISO Apr 2015target 2027
Emerita Energy Storage
Battery storage
206 MWIn study Alameda, CACAISO Apr 2023target 2028
Helios Grid Reliability
Battery storage
206 MWIn study Calaveras, CACAISO Apr 2023target 2028
Telluride
Solar + storage
205 MWIn study Fresno, CACAISO Apr 2023target 2030
Cabrera Reliability
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Antlia
Battery storage
205 MWIn study Monterey, CACAISO Apr 2023target 2031
Saguaro Energy Storage
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2029
Mt Baldy Energy Storage 2
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Phaenon
Solar + storage
204 MWIn study Kern, CACAISO Apr 2021target 2029
Huaso Hybrid
Solar + storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2026
Puma Storage
Battery storage
204 MWIn study Madera, CACAISO Apr 2021target 2030
Seahawk Storage
Battery storage
204 MWAgreement signed Santa Cruz, CACAISO Apr 2021target 2029
Cougar Storage
Battery storage
204 MWAgreement signed Merced, CACAISO Apr 2021target 2030
Apache Storage
Battery storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Kingsroad Hybrid Solar
Solar + storage
204 MWAgreement signed Kern, CACAISO Apr 2019target 2028
Puff Hybrid Solar
Solar + storage
204 MWIn study Kern, CACAISO Apr 2020target 2030
Little Bear 4
Solar + storage
203 MWAgreement signed Fresno, CACAISO Apr 20152020
Aramis Power Plant
Solar + storage
203 MWAgreement signed Alameda, CACAISO May 2017target 2026
Las Camas 3
Solar + storage
203 MWAgreement signed Merced, CACAISO Apr 2018target 2027
Las Camas 1
Solar + storage
203 MWAgreement signed Merced, CACAISO May 2017target 2027
Brundage Energy Storage
Battery storage
202 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Everest Energy Storage
Battery storage
202 MWIn study Kern, CACAISO Apr 2021target 2030
Kestrel Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2027
Tendril
Solar + storage
200 MWIn study Kern, CACAISO Apr 2023target 2031
Merlin Storage
Battery storage
200 MWIn study Los Angeles, CACAISO Apr 2021target 2032

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)