United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 480
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project AC1-125, Guernsey County Battery storage |
1.0 MW | Withdrawn / abandoned |
| Solar project AE2-163, Essex County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 879, Bonneville County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project X2-074, Camden County Solar |
1.0 MW | Withdrawn / abandoned |
| Other project N44, Kent County Other |
1.0 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2021-42, Luna County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 901397, Lenoir County Solar |
1.0 MW | Withdrawn / abandoned |
| Other project G124, Murray County Other |
1.0 MW | Withdrawn / abandoned |
| Solar project AH1-030, Cook County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 899257, Bladen County Solar |
1.0 MW | Withdrawn / abandoned |
| Hydro project G0482, Lewis County Hydro |
1.0 MW | Withdrawn / abandoned |
| Onshore wind project 170, Twin Falls County Onshore wind |
1.0 MW | Withdrawn / abandoned |
| Solar project AG2-421, Cumberland County Solar |
1.0 MW | Withdrawn / abandoned |
| Other project 284, Ada County Other |
1.0 MW | Withdrawn / abandoned |
| Hydro project 362, Lemhi County Hydro |
1.0 MW | Withdrawn / abandoned |
| NRG Red Bluff Solar 1 (Fka NRG Blythe Solar 2) Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2021-36, Luna County Solar |
1.0 MW | Withdrawn / abandoned |
| Levittown SP Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 625, Sevier County Solar · South Valley Sustainability Park |
1.0 MW | Withdrawn / abandoned |
| Solar project 1145, Box Elder County Solar |
1.0 MW | Withdrawn / abandoned |
| National Harbor – Battery Storage Battery storage |
1.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Solar project X3-026, Atlantic County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project G1065, Linn County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Other project 47, Owyhee County Other |
1.0 MW | Withdrawn / abandoned |
| AES Energy Storage Unit Battery storage |
1.0 MW | Withdrawn / abandoned |
| Solar project AG2-154, Northumberland County Solar |
1.0 MW | Withdrawn / abandoned |
| Onshore wind project 570, Walla Walla County Onshore wind |
0.9 MW | Withdrawn / abandoned |
| 4179 Suitland Road Solar |
0.9 MW | Withdrawn / abandoned |
| Other project Z2-020, Summit County Other |
0.9 MW | Withdrawn / abandoned |
| Geothermal project C4-021, Klamath County Geothermal |
0.9 MW | Withdrawn / abandoned |
| Onshore wind project 285, Sherman County Onshore wind |
0.9 MW | Withdrawn / abandoned |
| Gas project AB1-094, Cape May County Gas |
0.9 MW | Withdrawn / abandoned |
| Solar project 949286, Anderson County Solar |
0.9 MW | Withdrawn / abandoned |
| Lake Nelson 13 kV Solar Solar |
0.9 MW | Withdrawn / abandoned |
| Gas project AB1-093, Bergen County Gas |
0.9 MW | Withdrawn / abandoned |
| Dovetail Biogas Facility Other |
0.9 MW | Withdrawn / abandoned |
| Griffiss Technology Park Gas · GUSC Energy, Inc. |
0.9 MW | Withdrawn / abandoned |
| Solar project 1007, Wallowa County Solar |
0.9 MW | Withdrawn / abandoned |
| Other project 364, Twin Falls County Other |
0.8 MW | Withdrawn / abandoned |
| Hyland Landfill Other · Casella Waste Systems |
0.8 MW | Withdrawn / abandoned |
| Hydro project 228, Jackson County Hydro |
0.8 MW | Withdrawn / abandoned |
| Hydro project 149, Salt Lake County Hydro · BP Alternative Energy North America, Inc. |
0.8 MW | Withdrawn / abandoned |
| UD Motor Pool Battery storage |
0.8 MW | Withdrawn / abandoned |
| Landfill Gas Other |
0.8 MW | Withdrawn / abandoned |
| Gas project 80, Jerome County Gas |
0.8 MW | Withdrawn / abandoned |
| Hydro project 64, Canyon County Hydro |
0.8 MW | Withdrawn / abandoned |
| Hydro project 407, Lemhi County Hydro |
0.8 MW | Withdrawn / abandoned |
| Battery storage project AB1-120, Montgomery County Battery storage |
0.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)