BATTERY STORAGE · PJM

AES Energy Storage Unit

AES Energy Storage Unit is a 1.0 MW battery storage request withdrawn in the PJM interconnection queue, in Montgomery County, Pennsylvania, connecting to PECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingAug 2008 (not reached)
  6. Closed (not reached)

Request details

Queue ID
U3-001
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Barbadoes 34kV
Location
Montgomery County, Pennsylvania
Technology
Battery: 1.0 MW
Total requested
1.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Withdrawn
Entered queue
11 August 2008
Proposed online date
August 2008
Came online
August 2008
Withdrawn
September 2018

Location

Marker shows the centre of Montgomery County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Montgomery County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem