United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
NUCLEAR Β· PJMNuclear project V1-026, Montgomery County
Nuclear project V1-026, Montgomery County is a 20.0 MW nuclear request withdrawn in the PJM interconnection queue, in Montgomery County, Pennsylvania, connecting to PECO.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingApr 2011 (not reached)
- Closed (not reached)
Request details
- Queue ID
- V1-026
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Limerick
- Location
- Montgomery County, Pennsylvania
- Technology
- Nuclear: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Interim Study
- Queue status
- Withdrawn
- Entered queue
- 9 April 2009
- Proposed online date
- April 2011
- Came online
- April 2011
- Withdrawn
- July 2020
Location
Marker shows the centre of Montgomery County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Montgomery County
- MerckGas Β· 38.0 MW Β· built
- Pottstown LF Units 1 & 2Other Β· 5.0 MW Β· built
- Morris RoadOther Β· 4.1 MW Β· built
- Morris RoadOther Β· 2.0 MW Β· built
- Barbadoes Energy Storage UnitBattery storage Β· 1.0 MW Β· built
- Gas project U1-015, Montgomery CountyGas Β· 700 MW Β· withdrawn
- Gas project U1-014, Montgomery CountyGas Β· 700 MW Β· withdrawn
- Gas project B12, Montgomery CountyGas Β· 500 MW Β· withdrawn
- Gas project B38, Montgomery CountyGas Β· 100 MW Β· withdrawn
- Gas project B37, Montgomery CountyGas Β· 90.0 MW Β· withdrawn
- Gas project E17, Montgomery CountyGas Β· 75.0 MW Β· withdrawn
- Nuclear project V1-027, Montgomery CountyNuclear Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem