United States › Grid › Interconnection queues › Pennsylvania
BATTERY STORAGE · PJMBarbadoes Energy Storage Unit
Barbadoes Energy Storage Unit is a 1.0 MW battery storage request built and operating in the PJM interconnection queue, in Montgomery County, Pennsylvania, connecting to PECO.
Request details
- Queue ID
- Y1-057
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Barbadoes 34kV
- Location
- Montgomery County, Pennsylvania
- Technology
- Battery: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 25 April 2012
- Proposed online date
- December 2013
- Came online
- September 2013
Location
Marker shows the centre of Montgomery County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Montgomery County
- MerckGas · 38.0 MW · built
- Pottstown LF Units 1 & 2Other · 5.0 MW · built
- Morris RoadOther · 4.1 MW · built
- Morris RoadOther · 2.0 MW · built
- Gas project U1-015, Montgomery CountyGas · 700 MW · withdrawn
- Gas project U1-014, Montgomery CountyGas · 700 MW · withdrawn
- Gas project B12, Montgomery CountyGas · 500 MW · withdrawn
- Gas project B38, Montgomery CountyGas · 100 MW · withdrawn
- Gas project B37, Montgomery CountyGas · 90.0 MW · withdrawn
- Gas project E17, Montgomery CountyGas · 75.0 MW · withdrawn
- Nuclear project V1-026, Montgomery CountyNuclear · 20.0 MW · withdrawn
- Nuclear project V1-027, Montgomery CountyNuclear · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem