Merck

Merck is a 38.0 MW gas request built and operating in the PJM interconnection queue, in Montgomery County, Pennsylvania, connecting to PECO.

Queue statusOperating
  1. PlanningQueued Apr 2001 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2002 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G22
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
North Wales 34.5 kV
Location
Montgomery County, Pennsylvania
Technology
Gas: 38.0 MW
Total requested
38.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
6 April 2001
Proposed online date
September 2002
Came online
September 2002

Location

Marker shows the centre of Montgomery County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Montgomery County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem