United States › Grid › Interconnection queues › Maryland
BATTERY STORAGE · PJMNational Harbor ‚Äì Battery Storage
National Harbor – Battery Storage is a 1.0 MW battery storage request withdrawn in the PJM interconnection queue, in Prince George's County, Maryland, connecting to PEPCO.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-317
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PEPCO
- Connection point (POI)
- Livingston 13.8 kV
- Location
- Prince George's County, Maryland
- Technology
- Battery: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- February 2024
- Withdrawn
- April 2024
Location
Marker shows the centre of Prince George's County; the queue data does not give exact sites.
Other requests in Prince George's County
- Solar + storage project AH1-552, Prince George's CountySolar + storage · 670 MW · in study
- Battery storage project AH2-332, Prince George's CountyBattery storage · 115 MW · in study
- Gas project AH1-744, Prince George's CountyGas · 53.5 MW · in study
- Gas project AH2-269A, Prince George's CountyGas · 45.0 MW · in study
- Solar project AH2-065, Prince George's CountySolar · 2.0 MW · in study
- Keys Energy CenterGas · 736 MW · built
- Keys Energy CenterGas · 64.5 MW · built
- Chalk PointGas · 6.0 MW · built
- Spectrum SolarSolar · 5.6 MW · built
- Other project H20, Prince George's CountyOther · 3.5 MW · built
- Rollins Avenue PhoenixSolar · 2.5 MW · built
- Chalk Point CT 2Gas · 2.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem