United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 44

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 44 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Gale Avenue Solar
Solar
5.0 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2012
Purdy Ave PV
Solar
4.9 MWWithdrawn / abandoned Kern, CACAISO May 2010target 2010
Nas North Island Cogeneration
Gas
4.7 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2014
Bantam Energy Storage
Battery storage
3.8 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Pascal Energy Storage
Battery storage
3.7 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
San Ysidro Energy Storage
Battery storage
3.7 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Frates
Battery storage
3.7 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Coyote Ranch Energy Storage
Battery storage
3.7 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Camptonville Biopower
Other
3.4 MWWithdrawn / abandoned Yuba, CACAISO Dec 2018target 2021
Goose Haven Energy Center
Solar
3.0 MWWithdrawn / abandoned Solano, CACAISO Mar 2011target 2013
Re Monterey
Solar
3.0 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2013
Creed Energy Center
Solar
3.0 MWWithdrawn / abandoned Solano, CACAISO Mar 2011target 2013
Lambie Energy Center
Solar
3.0 MWWithdrawn / abandoned Solano, CACAISO Mar 2011target 2013
Centinela Solar Energy Facility 2MWFT
Solar
2.0 MWWithdrawn / abandoned Imperial, CACAISO Jun 2014target 2015
Alpine Suntower Generation Station
Solar
2.0 MWWithdrawn / abandoned Los Angeles, CACAISO Jul 2009target 2020
GV1
Solar
2.0 MWWithdrawn / abandoned Alameda, CACAISO May 2007target 2008
Birds Landing Wind
Onshore wind
1.8 MWWithdrawn / abandoned Solano, CACAISO Apr 2015target 2017
Westlands Solar Farms PV2
Solar
1.5 MWWithdrawn / abandoned Fresno, CACAISO May 2014target 2015
Lassen Lodge Hydroelectric Project Expansion
Hydro
1.4 MWWithdrawn / abandoned Tehama, CACAISO Apr 2012target 2013
Calrenew-1 Expansion
Solar
1.3 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2013
Wre - Coalinga (49/120MW)
Solar
1.0 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2017
NRG Solar Victor 1
Solar
1.0 MWWithdrawn / abandoned San Bernardino, CACAISO Feb 2010target 2017
NRG Red Bluff Solar 1 (Fka NRG Blythe Solar 2)
Solar
1.0 MWWithdrawn / abandoned Riverside, CACAISO Feb 2010target 2017
Holly Ranch
Solar
0.5 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Elevation Solar C
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Aspiration Solar E
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
Liberty Solar
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2016
Citizen Solar C
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
Inspiration Solar C
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Zodiac Solar
Solar
0.1 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2015
Citizen Solar D
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
North Valley Solar
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Geysers Unit 11 Reconnection
Geothermal
0.1 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2015target 2017
Inspiration Solar E
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Aspiration Solar D
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
Inspiration Solar F
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Page 44 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)