United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 44
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gale Avenue Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Purdy Ave PV Solar |
4.9 MW | Withdrawn / abandoned |
| Nas North Island Cogeneration Gas |
4.7 MW | Withdrawn / abandoned |
| Bantam Energy Storage Battery storage |
3.8 MW | Withdrawn / abandoned |
| Pascal Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| San Ysidro Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Frates Battery storage |
3.7 MW | Withdrawn / abandoned |
| Coyote Ranch Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Camptonville Biopower Other |
3.4 MW | Withdrawn / abandoned |
| Goose Haven Energy Center Solar |
3.0 MW | Withdrawn / abandoned |
| Re Monterey Solar |
3.0 MW | Withdrawn / abandoned |
| Creed Energy Center Solar |
3.0 MW | Withdrawn / abandoned |
| Lambie Energy Center Solar |
3.0 MW | Withdrawn / abandoned |
| Centinela Solar Energy Facility 2MWFT Solar |
2.0 MW | Withdrawn / abandoned |
| Alpine Suntower Generation Station Solar |
2.0 MW | Withdrawn / abandoned |
| GV1 Solar |
2.0 MW | Withdrawn / abandoned |
| Birds Landing Wind Onshore wind |
1.8 MW | Withdrawn / abandoned |
| Westlands Solar Farms PV2 Solar |
1.5 MW | Withdrawn / abandoned |
| Lassen Lodge Hydroelectric Project Expansion Hydro |
1.4 MW | Withdrawn / abandoned |
| Calrenew-1 Expansion Solar |
1.3 MW | Withdrawn / abandoned |
| Wre - Coalinga (49/120MW) Solar |
1.0 MW | Withdrawn / abandoned |
| NRG Solar Victor 1 Solar |
1.0 MW | Withdrawn / abandoned |
| NRG Red Bluff Solar 1 (Fka NRG Blythe Solar 2) Solar |
1.0 MW | Withdrawn / abandoned |
| Holly Ranch Solar |
0.5 MW | Withdrawn / abandoned |
| Elevation Solar C Solar |
0.1 MW | Withdrawn / abandoned |
| Aspiration Solar E Solar |
0.1 MW | Withdrawn / abandoned |
| Liberty Solar Solar |
0.1 MW | Withdrawn / abandoned |
| Citizen Solar C Solar |
0.1 MW | Withdrawn / abandoned |
| Inspiration Solar C Solar |
0.1 MW | Withdrawn / abandoned |
| Zodiac Solar Solar |
0.1 MW | Withdrawn / abandoned |
| Citizen Solar D Solar |
0.1 MW | Withdrawn / abandoned |
| North Valley Solar Solar |
0.1 MW | Withdrawn / abandoned |
| Geysers Unit 11 Reconnection Geothermal |
0.1 MW | Withdrawn / abandoned |
| Inspiration Solar E Solar |
0.1 MW | Withdrawn / abandoned |
| Aspiration Solar D Solar |
0.1 MW | Withdrawn / abandoned |
| Inspiration Solar F Solar |
0.1 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)