United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Birds Landing Wind

Birds Landing Wind is a 1.8 MW onshore wind request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedDec 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1098
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Birds Landing Substation 230kV
Location
Solano County, California
Technology
Wind: 1.8 MW
Total requested
1.8 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
December 2017
Withdrawn
December 2016

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Solano County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem