United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOAspiration Solar D
Aspiration Solar D is a 0.1 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedJul 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 799
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Mendota-San Joaquin-Helm 70kV
- Location
- Fresno County, California
- Technology
- Solar: 0.1 MW
- Total requested
- 0.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2011
- Proposed online date
- November 2015
- Withdrawn
- July 2016
Location
Marker shows the centre of Fresno County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Fresno County
- DardenSolar + storage Β· 2,365 MW Β· agreement signed
- ScarletSolar + storage Β· 800 MW Β· agreement signed
- Cornucopia HybridSolar + storage Β· 605 MW Β· agreement signed
- Lock StorageBattery storage Β· 508 MW Β· agreement signed
- ElysianSolar + storage Β· 412 MW Β· agreement signed
- ClarksonSolar + storage Β· 408 MW Β· agreement signed
- SonrisaSolar + storage Β· 384 MW Β· agreement signed
- Luna Valley SolarSolar + storage Β· 373 MW Β· agreement signed
- Key Storage 1Battery storage Β· 309 MW Β· agreement signed
- Ciervo Mountain HybridSolar + storage Β· 255 MW Β· agreement signed
- Midway PeakingGas Β· 240 MW Β· agreement signed
- Heartland 2Solar + storage Β· 228 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem