United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

GV1

GV1 is a 2.0 MW solar request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
208
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tracy-Herdlyn 69kV line
Location
Alameda County, California
Technology
Solar: 2.0 MW
Total requested
2.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 May 2007
Proposed online date
September 2008

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem