United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Purdy Ave PV

Purdy Ave PV is a 4.9 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2010 (completed)
  2. Withdrawn / abandonedFeb 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
630
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Goldtown Substation 66kV
Location
Kern County, California
Technology
Solar: 4.9 MW
Total requested
4.9 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
20 May 2010
Proposed online date
December 2010
Withdrawn
February 2011

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.