SOLAR Β· CAISOLambie Energy Center
Lambie Energy Center is a 3.0 MW solar request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedDec 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 719
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Lambie Switching Station 230 KV
- Location
- Solano County, California
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2011
- Proposed online date
- November 2013
- Withdrawn
- December 2011
Location
Marker shows the centre of Solano County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Solano County
- CorbyBattery storage Β· 314 MW Β· agreement signed
- Montezuma IIWind + storage Β· 132 MW Β· agreement signed
- Solano 4 WindOnshore wind Β· 92.4 MW Β· agreement signed
- Montezuma (High Winds III)Wind + storage Β· 76.0 MW Β· agreement signed
- Corby 2Battery storage Β· 476 MW Β· in study
- TolenasBattery storage Β· 417 MW Β· in study
- BrushyBattery storage Β· 400 MW Β· in study
- High Winds StorageBattery storage Β· 121 MW Β· in study
- Toland Renewable Energy ParkOnshore wind Β· 108 MW Β· in study
- Arges BESSBattery storage Β· 102 MW Β· in study
- Shiloh IIIOnshore wind Β· 200 MW Β· built
- Shiloh Wind Farm IIOnshore wind Β· 150 MW Β· built