United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 39
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lasalle Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Stratford Solar Farm Solar |
20.0 MW | Withdrawn / abandoned |
| Gypsum Solar |
20.0 MW | Withdrawn / abandoned |
| Desert Vista Greenworks B Solar |
20.0 MW | Withdrawn / abandoned |
| Five Points Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Sunlite Station Solar |
20.0 MW | Withdrawn / abandoned |
| Ifs Solar |
20.0 MW | Withdrawn / abandoned |
| Brannon Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Piute Solar |
20.0 MW | Withdrawn / abandoned |
| Re Soledad Solar |
20.0 MW | Withdrawn / abandoned |
| Sungen I 20MW Solar PV Plant Solar |
20.0 MW | Withdrawn / abandoned |
| Bancroft Battery storage |
20.0 MW | Withdrawn / abandoned |
| Buttonwood Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Re Wildwood Solar |
20.0 MW | Withdrawn / abandoned |
| La-Solar-20 Solar |
20.0 MW | Withdrawn / abandoned |
| Re Tehachapi Solar 2 Solar |
20.0 MW | Withdrawn / abandoned |
| Enrico Matson 2 Solar |
20.0 MW | Withdrawn / abandoned |
| Re Juniper Solar |
20.0 MW | Withdrawn / abandoned |
| FRV Centauri Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Acacia Solar |
20.0 MW | Withdrawn / abandoned |
| Graham Solar Farm II Expansion Solar |
20.0 MW | Withdrawn / abandoned |
| Ee Rosamond Solar |
20.0 MW | Withdrawn / abandoned |
| Sun Seeker Solar Energy Center Solar |
20.0 MW | Withdrawn / abandoned |
| Magellan Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Graham - Westlands Project Solar |
20.0 MW | Withdrawn / abandoned |
| Coalinga Solar Center Solar |
20.0 MW | Withdrawn / abandoned |
| Bio Verde PV - Hoogendm Solar |
20.0 MW | Withdrawn / abandoned |
| Stratford Solar - C5 Solar |
20.0 MW | Withdrawn / abandoned |
| Sirius Solar Solar |
20.0 MW | Withdrawn / abandoned |
| FRV Aldebaran Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Kasson Manteca Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Old River 2 Solar |
20.0 MW | Withdrawn / abandoned |
| Sun Stream Solar |
20.0 MW | Withdrawn / abandoned |
| Kingsolar I Solar |
20.0 MW | Withdrawn / abandoned |
| Sunshine Four Solar |
20.0 MW | Withdrawn / abandoned |
| Painted Hills IV Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Thunderhill Solar Power Solar |
20.0 MW | Withdrawn / abandoned |
| FRV Pegasus Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Monolith 20 MW (Fka Wdat-Breeze) Solar |
20.0 MW | Withdrawn / abandoned |
| Le Grand Ca 20 MW Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Inyokern Power Plant Solar |
20.0 MW | Withdrawn / abandoned |
| Bio Verde PV - Kettleman 3 Solar |
20.0 MW | Withdrawn / abandoned |
| Kingsolar III Solar |
20.0 MW | Withdrawn / abandoned |
| Valle Del Sol Solar |
20.0 MW | Withdrawn / abandoned |
| AS LH PV 20MW Solar |
20.0 MW | Withdrawn / abandoned |
| Diablo Energy Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Angiola Water District Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Premier Power Russell Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Re Palmer Solar |
20.0 MW | Withdrawn / abandoned |
| Bio Verde PV - San Joaquin Solar |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)