SOLAR Β· CAISO

FRV Aldebaran Solar

FRV Aldebaran Solar is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2009 (completed)
  2. Withdrawn / abandonedMar 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
536
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mercy Springs 70kV Line
Location
Merced County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
19 November 2009
Proposed online date
December 2011
Withdrawn
March 2010

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County