United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Gypsum

Gypsum is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandonedNov 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
650B
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Line to be constructed 1 mile south & tie into SCE 69kV
Location
Riverside County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
13 September 2010
Proposed online date
February 2012
Withdrawn
November 2010

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County