United States › Grid › Interconnection queues › California

SOLAR · CAISO

Angiola Water District Solar Project

Angiola Water District Solar Project is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2009 (completed)
  2. Withdrawn / abandonedNov 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
530
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Alpaugh 115kV substation
Location
Tulare County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 October 2009
Proposed online date
July 2011
Withdrawn
November 2011

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Tulare County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem