Five Points Solar

Five Points Solar is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandonedDec 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
618A
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Helms-Schindler 70kV
Location
Fresno County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
19 April 2010
Proposed online date
January 2012
Withdrawn
December 2010

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.