Piute

Piute is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2010 (completed)
  2. Withdrawn / abandonedJan 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
653FB
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Lancaster-Little Rock-Piute 66kV
Location
Los Angeles County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
13 October 2010
Proposed online date
December 2013
Withdrawn
January 2012

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Los Angeles County