Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11528.9 GW
Active in queue28.9 GW115 requests
Agreement signed14.9 GW54 requests
Withdrawn558,621 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

115 requests Β· page 3 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
BRP Diran BESS
Battery storage Β· BRP Diran BESS LLC
101 MWAgreement signed Wharton, TXERCOT Dec 2020target 2028
BRP Musca BESS
Battery storage Β· BRP Musca BESS LLC
101 MWIn study Reagan, TXERCOT Jul 2020target 2027
SPC Bloom BESS
Battery storage Β· BRP Blue Topaz 2, LLC
100 MWIn study Victoria, TXERCOT Dec 2020target 2027
Big Star Storage
Battery storage Β· RWE Solar Development, LLC
80.0 MWAgreement signed Bastrop, TXERCOT Jan 2020target 2026
Noria Storage
Battery storage
75.0 MWPaused / redesign Nueces, TXERCOT Aug 2020target 2025
Creekfield Storage
Battery storage
69.0 MWPaused / redesign Fort Bend, TXERCOT Nov 2020
Celeste Energy Storage
Battery storage
60.9 MWPaused / redesign Pecos, TXERCOT Apr 2020
Lubio Solar
Solar Β· BDPU Solar Lubio LLC
54.5 MWAgreement signed Kaufman, TXERCOT Oct 2020target 2028
Dori BQ Solar
Solar + storage Β· Sunnyside Energy, LLC
50.4 MWAgreement signed Harris, TXERCOT Jun 2020target 2027
Tain Solar
Solar Β· Abei Energy Green VII LLC
37.5 MWIn study Caldwell, TXERCOT Dec 2020target 2027
Delaware Ranch Solar
Solar Β· Delaware Ranch Solar, LLC
36.0 MWAgreement signed Culberson, TXERCOT Dec 2020target 2026
Ty Cooke
Gas
33.0 MWPaused / redesign Lubbock, TXERCOT Aug 2020target 2021
Hayhurst Texas Solar
Solar Β· Hayhurst Texas Solar, LLC
24.8 MWAgreement signed Culberson, TXERCOT Aug 2020target 2025
Brazos Wind Repower
Onshore wind Β· BRAZOS WIND VENTURES, LLC
22.4 MWIn study Scurry, TXERCOT Dec 2020target 2025
Hays Energy Unit 3 Repower
Gas Β· HAYS ENERGY, LLC
18.0 MWIn study Hays, TXERCOT Oct 2020target 2026
Page 3 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)