United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in CAISO (California) — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Galadriel Battery storage |
318 MW | In study |
| Quaking Aspen Solar + storage |
318 MW | In study |
| Cargo Storage Battery storage |
313 MW | In study |
| Bell Bluff Storage Battery storage |
313 MW | In study |
| Cowboy Solar + storage |
312 MW | In study |
| Mesquite Solar 6 Solar + storage |
309 MW | In study |
| Harmony Storage 2 Battery storage |
308 MW | In study |
| Jackrabbit Power Bank Battery storage |
308 MW | In study |
| Juniper Storage Solar + storage |
307 MW | In study |
| Green Palms Solar |
307 MW | In study |
| Serenity Solar |
305 MW | In study |
| Gosford Solar Storage Solar |
305 MW | In study |
| Gnarly Osage Battery storage |
304 MW | In study |
| Twinkle Battery storage |
304 MW | In study |
| Carmine Battery storage |
292 MW | In study |
| Shoestring Solar + storage |
270 MW | In study |
| Geras Solar + storage |
268 MW | In study |
| Fika Battery storage |
259 MW | In study |
| Zeitgeist K Energy Center Battery storage |
258 MW | In study |
| Annapurna Battery storage |
257 MW | In study |
| Delamar Energy Storage 2 Battery storage |
256 MW | In study |
| Almande Energy Storage Battery storage |
256 MW | In study |
| Sherman Energy Storage Battery storage |
256 MW | In study |
| Gateway Energy Storage 2 Battery storage |
256 MW | In study |
| Sandbar Energy Storage Battery storage |
256 MW | In study |
| Commerce Energy Storage 2 Battery storage |
250 MW | In study |
| Weston Storage Battery storage |
214 MW | In study |
| Frigatebird Storage Battery storage |
214 MW | In study |
| Octans Solar + storage |
207 MW | In study |
| Fornax Solar + storage |
206 MW | In study |
| Rover Battery storage |
206 MW | In study |
| Emerita Energy Storage Battery storage |
206 MW | In study |
| Helios Grid Reliability Battery storage |
206 MW | In study |
| Telluride Solar + storage |
205 MW | In study |
| Cabrera Reliability Battery storage |
205 MW | In study |
| Antlia Battery storage |
205 MW | In study |
| Saguaro Energy Storage Battery storage |
205 MW | In study |
| Mt Baldy Energy Storage 2 Battery storage |
205 MW | In study |
| Container Solar |
205 MW | In study |
| Grapevine 1 Solar |
205 MW | In study |
| Nelson Hills Solar |
205 MW | In study |
| Phaenon Solar + storage |
204 MW | In study |
| Puma Storage Battery storage |
204 MW | In study |
| Puff Hybrid Solar Solar + storage |
204 MW | In study |
| Brundage Energy Storage Battery storage |
202 MW | In study |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Tendril Solar + storage |
200 MW | In study |
| Merlin Storage Battery storage |
200 MW | In study |
| Conduit Energy Storage 2 Battery storage |
199 MW | In study |
| Buttercup Hybrid Solar Solar + storage |
197 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)