United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in CAISO (California) — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown19492.4 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

194 requests · page 3 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Galadriel
Battery storage
318 MWIn study Madera, CACAISO Apr 2023target 2031
Quaking Aspen
Solar + storage
318 MWIn study Kern, CACAISO Apr 2023target 2029
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Cowboy
Solar + storage
312 MWIn study Colusa, CACAISO Apr 2023target 2030
Mesquite Solar 6
Solar + storage
309 MWIn study Maricopa, AZCAISO Apr 2023target 2028
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Jackrabbit Power Bank
Battery storage
308 MWIn study Santa Clara, CACAISO Apr 2023target 2029
Juniper Storage
Solar + storage
307 MWIn study Los Angeles, CACAISO Apr 2021target 2033
Green Palms
Solar
307 MWIn study Riverside, CACAISO Apr 2023target 2030
Serenity
Solar
305 MWIn study Nye, NVCAISO Apr 2023target 2031
Gosford Solar Storage
Solar
305 MWIn study Kern, CACAISO Apr 2023target 2029
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
Twinkle
Battery storage
304 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Carmine
Battery storage
292 MWIn study Riverside, CACAISO Apr 2021target 2031
Shoestring
Solar + storage
270 MWIn study Fresno, CACAISO Apr 2023target 2031
Geras
Solar + storage
268 MWIn study Stanislaus, CACAISO Apr 2023target 2028
Fika
Battery storage
259 MWIn study Merced, CACAISO Apr 2023target 2029
Zeitgeist K Energy Center
Battery storage
258 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Annapurna
Battery storage
257 MWIn study Merced, CACAISO Apr 2023target 2028
Delamar Energy Storage 2
Battery storage
256 MWIn study Clark, NVCAISO Apr 2021target 2027
Almande Energy Storage
Battery storage
256 MWIn study Merced, CACAISO Apr 2021target 2030
Sherman Energy Storage
Battery storage
256 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Gateway Energy Storage 2
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2035
Sandbar Energy Storage
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2030
Commerce Energy Storage 2
Battery storage
250 MWIn study Los Angeles, CACAISO Apr 2020target 2026
Weston Storage
Battery storage
214 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Frigatebird Storage
Battery storage
214 MWIn study San Diego, CACAISO Apr 2021target 2035
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Emerita Energy Storage
Battery storage
206 MWIn study Alameda, CACAISO Apr 2023target 2028
Helios Grid Reliability
Battery storage
206 MWIn study Calaveras, CACAISO Apr 2023target 2028
Telluride
Solar + storage
205 MWIn study Fresno, CACAISO Apr 2023target 2030
Cabrera Reliability
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Antlia
Battery storage
205 MWIn study Monterey, CACAISO Apr 2023target 2031
Saguaro Energy Storage
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2029
Mt Baldy Energy Storage 2
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Container
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Grapevine 1
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Nelson Hills
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Phaenon
Solar + storage
204 MWIn study Kern, CACAISO Apr 2021target 2029
Puma Storage
Battery storage
204 MWIn study Madera, CACAISO Apr 2021target 2030
Puff Hybrid Solar
Solar + storage
204 MWIn study Kern, CACAISO Apr 2020target 2030
Brundage Energy Storage
Battery storage
202 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Everest Energy Storage
Battery storage
202 MWIn study Kern, CACAISO Apr 2021target 2030
Tendril
Solar + storage
200 MWIn study Kern, CACAISO Apr 2023target 2031
Merlin Storage
Battery storage
200 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Conduit Energy Storage 2
Battery storage
199 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Buttercup Hybrid Solar
Solar + storage
197 MWIn study Merced, CACAISO Apr 2021target 2032

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)