🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in CAISO (California) — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown23437.6 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

234 requests · page 2 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Aquamarine Westside
Solar
250 MWOperating Kings, CACAISO Apr 20152021
Gateway Energy Storage
Battery storage
250 MWOperating San Diego, CACAISO Apr 20152025
Mojave Solar (Fka Harper Lake Solar)
Solar
250 MWOperating San Bernardino, CACAISO Aug 20062014
California Valley Solar Ranch (Fka Carrizo Solar Farm II)
Solar
250 MWOperating San Luis Obispo, CACAISO Jul 20072014
Av Solar One Project
Solar
250 MWOperating Los Angeles, CACAISO May 20082014
Victory Pass Solar
Solar + storage
250 MWOperating Riverside, CACAISO Apr 20152024
Russell City Energy Center Expansion
Gas
245 MWOperating Alameda, CACAISO May 20052013
Quartzite Solar 11
Solar + storage
225 MWOperating Riverside, CACAISO Apr 20182024
Quartzite Solar 8
Solar + storage
225 MWOperating Riverside, CACAISO Apr 20152024
Voyager Wind
Onshore wind
220 MWOperating Kern, CACAISO Mar 20062021
Carlsbad 1
Gas
211 MWOperating San Diego, CACAISO Oct 20062018
California Valley PV
Solar
210 MWOperating San Luis Obispo, CACAISO Jan 20072014
Tranquillity 8
Solar
206 MWOperating Fresno, CACAISO Apr 20142018
Peregrine Storage
Battery storage
200 MWOperating San Diego, CACAISO Apr 20192025
Shiloh III
Onshore wind
200 MWOperating Solano, CACAISO Nov 20042012
Sandrini Sol 2
Solar
200 MWOperating Kern, CACAISO May 20172024
Black Diamond Energy Storage
Battery storage
200 MWOperating Contra Costa, CACAISO Apr 20152022
Rising Tree Wind Farm (Fka Homestead Wind Farm)
Onshore wind
198 MWOperating Kern, CACAISO Mar 20072015
Mariposa Energy Project (Fka DGC Kelso CT)
Gas
196 MWOperating Alameda, CACAISO Apr 20082012
Rosamond South East
Solar + storage
192 MWOperating Kern, CACAISO Apr 20152025
Northern Orchard Solar
Solar + storage
192 MWOperating Kern, CACAISO Apr 20132025
Carrizo Plain Solar
Solar
190 MWOperating San Luis Obispo, CACAISO Apr 20072014
Manzana Wind
Other
189 MWOperating Kern, CACAISO Sep 20032018
Elkhorn Energy Storage
Battery storage
189 MWOperating Monterey, CACAISO May 20172022
Desert Harvest
Solar + storage
185 MWOperating Riverside, CACAISO Jul 20102020
Sagebrush Solar 2
Battery storage
179 MWOperating Kern, CACAISO May 20162024
Re Mustang
Solar + storage
175 MWOperating Kings, CACAISO Jul 20102021
Re Astoria
Solar
175 MWOperating Kern, CACAISO Mar 20112016
Antelope Valley Complex
Solar + storage
170 MWOperating Kern, CACAISO Apr 20152025
Mesquite Solar 1 (Fka Mesquite Generation)
Solar
165 MWOperating Maricopa, AZCAISO Jul 20102014
North SKY River Wind
Onshore wind
162 MWOperating Kern, CACAISO Sep 20062012
CMS2 (Fka Boulder City PV)
Solar
155 MWOperating Clark, NVCAISO Jul 20092015
Mustang 2
Solar
153 MWOperating Kings, CACAISO Apr 20142020
Tropico Solar
Solar + storage
152 MWOperating Kern, CACAISO May 20162022
Mesquite Solar 3
Solar
152 MWOperating Maricopa, AZCAISO Apr 20142019
Shiloh Wind Farm II
Onshore wind
150 MWOperating Solano, CACAISO Jan 20042009
High 5 Solar
Solar + storage
150 MWOperating San Bernardino, CACAISO May 20172021
Desert Topaz PV 2
Solar
150 MWOperating San Luis Obispo, CACAISO Jul 20072014
Imperial Valley West
Solar
150 MWOperating Imperial, CACAISO Feb 20102016
Sun Streams Solar 2
Solar
150 MWOperating Maricopa, AZCAISO Apr 20152021
Shiloh I Wind Project
Onshore wind
150 MWOperating Solano, CACAISO Dec 20022006
Campo Verde Solar (Fka Uss Wixom Solar 1)
Solar
147 MWOperating Imperial, CACAISO Feb 20102013
Humboldt Bay Power Plant Repowering Project
Gas
146 MWOperating Humboldt, CACAISO Nov 20042010
Catalina Solar
Solar
145 MWOperating Kern, CACAISO Feb 20102022
Pacific Wind
Onshore wind
141 MWOperating Kern, CACAISO Jun 20052012
PV2 Panoche Valley Solar (Aka Sge Panoche Valley Solar)
Solar
140 MWOperating San Benito, CACAISO Mar 20112018
Ivanpah Segs 3
Solar
132 MWOperating San Bernardino, CACAISO Jun 20072013
DPT 1
Solar
132 MWOperating San Bernardino, CACAISO Sep 20062013
North Central Valley
Battery storage
132 MWOperating San Joaquin, CACAISO Apr 20152023
IV Substation South
Solar
130 MWOperating Imperial, CACAISO Jul 20092013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)