United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 16
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project Company 218, Clark County Solar + storage |
460 MW | Paused / redesign |
| Gas project 301, Colleton County Gas |
458 MW | In study |
| Gas project 300, Colleton County Gas |
458 MW | In study |
| Red Butte Wind Onshore wind · Red Butte Wind, LLC |
457 MW | In study |
| Gas project GEN-2024-247, Payne County Gas |
457 MW | In study |
| Gas project 960889, Rowan County Gas |
455 MW | In study |
| Gas project 961188, Stokes County Gas |
455 MW | In study |
| Gas project 961210, Stokes County Gas |
455 MW | In study |
| Gas project 956747, Rowan County Gas |
455 MW | In study |
| Gas project E0037, Sheboygan County Gas · Wisconsin Power and Light Company (WPL) |
455 MW | In study |
| Gas project E0038, Winnebago County Gas · Wisconsin Power and Light Company (WPL) |
455 MW | In study |
| Salt-Lick Solar Solar + storage · Salt-Lick Solar, LLC |
453 MW | In study |
| TRIFECTA Gas Gas · NET Power |
453 MW | In study |
| Gas project 2023-G13, La Paz County Gas |
453 MW | In study |
| Cedar Draw Solar Solar + storage · Cedar Draw Solar LLC |
451 MW | In study |
| Gas project ERAS-2025-007, Nodaway County Gas |
451 MW | In study |
| Gas project ERAS-2025-013, Nodaway County Gas |
451 MW | In study |
| Gas project 08-030, Morrow County Gas |
450 MW | Paused / redesign |
| Battery storage project AH2-416, Livingston County Battery storage |
450 MW | In study |
| Solar + storage project J3030, Jefferson County Solar + storage |
450 MW | In study |
| Solar + storage project Q44, Millard County Solar + storage · Intermountain Power Agency |
450 MW | In study |
| Dolphin Solar Solar · Dolphin Solar LLC |
450 MW | In study |
| Gas project 08-031, Columbia County Gas |
450 MW | Paused / redesign |
| Battery storage project 25-IC-1385, Hancock County Battery storage |
450 MW | In study |
| Battery storage project 310, Meagher County Battery storage |
450 MW | Paused / redesign |
| Calpine Guadalupe Peakers Gas · Guadalupe Peaking Energy Center, LLC |
450 MW | In study |
| Solar + storage project J2914, St. Tammany Parish County Solar + storage |
450 MW | In study |
| Solar + storage project Q337, Yavapai County Solar + storage |
450 MW | In study |
| Battery storage project AI1-022, Huntington County Battery storage |
450 MW | In study |
| Solar project J2966, Quitman County Solar |
450 MW | In study |
| Coal project ERAS-2025-009, Chouteau County Coal |
450 MW | In study |
| Solar + storage project Q352, Navajo County Solar + storage |
450 MW | In study |
| Battery storage project C002, Meagher County Battery storage |
450 MW | Paused / redesign |
| Onshore wind project 5RSC-2024-16, Cheyenne County Onshore wind |
450 MW | In study |
| Other project Q567, Maricopa County Other |
450 MW | In study |
| Solar + storage project Company OF, Lander County Solar + storage |
450 MW | Paused / redesign |
| Big Watt Power Austin-1 Gas · Big Watt Power Austin-1 LLC |
449 MW | In study |
| Bull Run II Wind Onshore wind · Bull Run Energy LLC |
449 MW | In study |
| Solar project G0712, Sherman County Solar |
448 MW | In study |
| Zeus Spade BESS Wind + storage · Spade BESS |
446 MW | In study |
| Aurelius 2 Solar Solar · IP Roman, LLC |
445 MW | In study |
| Aurelius 3 Solar Solar · IP Roman III, LLC |
445 MW | In study |
| Onshore wind project J3730, Macoupin County Onshore wind |
444 MW | In study |
| Tempesta Solar |
443 MW | Paused / redesign |
| Solar project J1858, Mississippi County Solar |
440 MW | In study |
| Poco Trail Solar Solar · Eastern Trail Solar Center, LLC |
439 MW | In study |
| Ocean Wind LLC Offshore wind |
432 MW | Paused / redesign |
| Monroe ERAS Battery storage · DTE Electric |
432 MW | In study |
| Solar project J3762, Clay County Solar |
430 MW | In study |
| Mineral King Solar Solar + storage |
430 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)