United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2015 requests) โ page 14
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project AA2-126, Gloucester County Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar project 474, Malheur County Solar |
5.0 MW | Withdrawn / abandoned |
| Otay Mesa Cinco Battery storage |
5.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
5.0 MW | Withdrawn / abandoned |
| Saltville-Holston 34.5kV Solar Facility Solar |
5.0 MW | Withdrawn / abandoned |
| Saltville-Holston 34.5kV Solar Facility Solar |
5.0 MW | Withdrawn / abandoned |
| Gas project 12 Gas |
5.0 MW | Withdrawn / abandoned |
| Solar project AA2-037, Caroline County Solar |
5.0 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2015-027, Gray County Onshore wind |
4.9 MW | Withdrawn / abandoned |
| Solar project AB1-168, Camden County Solar |
4.5 MW | Withdrawn / abandoned |
| Boykins Solar Solar |
4.5 MW | Withdrawn / abandoned |
| Solar project 499, Malheur County Solar |
4.4 MW | Withdrawn / abandoned |
| Thornton Solar Facility Solar |
4.4 MW | Withdrawn / abandoned |
| Westmoreland Landfill Project Other |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-147, Dorchester County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-168, Prince George's County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project 490, Malheur County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-153, Frederick County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-084, Washington County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-155, Washington County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AA2-143, Frederick County Solar |
4.0 MW | Withdrawn / abandoned |
| Solar project AB1-032, Athens County Solar |
3.3 MW | Withdrawn / abandoned |
| Solar project 679, Iron County Solar |
3.3 MW | Withdrawn / abandoned |
| Solar project 678, Iron County Solar |
3.3 MW | Withdrawn / abandoned |
| Other project 722, Salt Lake County Other |
3.2 MW | Withdrawn / abandoned |
| Lake County Generating Station Other |
3.1 MW | Withdrawn / abandoned |
| Solar Solar |
3.1 MW | Withdrawn / abandoned |
| Solar project 228, Judith Basin County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 240, Gallatin County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 237, Judith Basin County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 184, Missoula County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 724, Douglas County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 200, Broadwater County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 187, Lewis And Clark County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 239, Judith Basin County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 219, Lewis And Clark County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 232, Cascade County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 217, Silver Bow County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 191, Deer Lodge County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 180, Yellowstone County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 190, Deer Lodge County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 505, Baker County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 716, Douglas County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 709, Iron County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 182, Yellowstone County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 212, Cascade County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 199, Broadwater County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 192, Deer Lodge County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 183, Yellowstone County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 227, Judith Basin County Solar |
3.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)231 ยท 27.2 GW
- MISO (Midcontinent)53 ยท 17.2 GW
- CAISO (California)91 ยท 12.3 GW
- SPP (Southwest Power Pool)72 ยท 11.1 GW
- ISO-NE (New England)46 ยท 7,500 MW
- West (non-ISO utilities)197 ยท 6,025 MW
- ERCOT (Texas)28 ยท 5,278 MW
- Southeast (non-ISO utilities)49 ยท 4,719 MW
- NYISO (New York)33 ยท 4,251 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)