United States โ€บ Grid โ€บ Interconnection queues

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in the USA (2015 requests) โ€” page 14

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown80095.6 GW
Active in queue15.8 GW73 requests
Agreement signed8,536 MW38 requests
Withdrawn80095.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

800 requests ยท page 14 of 16
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project AA2-126, Gloucester County
Battery storage
5.0 MWWithdrawn / abandoned Gloucester, NJPJM Apr 2015target 2016
Solar project 474, Malheur County
Solar
5.0 MWWithdrawn / abandoned Malheur, ORWest Mar 2015
Otay Mesa Cinco
Battery storage
5.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Wind
Onshore wind
5.0 MWWithdrawn / abandoned Orleans, VTISO-NE Feb 2015target 2016
Saltville-Holston 34.5kV Solar Facility
Solar
5.0 MWWithdrawn / abandoned Smyth, VAPJM Dec 2015target 2017
Saltville-Holston 34.5kV Solar Facility
Solar
5.0 MWWithdrawn / abandoned Smyth, VAPJM Dec 2015target 2017
Gas project 12
Gas
5.0 MWWithdrawn / abandoned FLSoutheast Sep 2015
Solar project AA2-037, Caroline County
Solar
5.0 MWWithdrawn / abandoned Caroline, MDPJM Jan 2015target 2015
Onshore wind project GEN-2015-027, Gray County
Onshore wind
4.9 MWWithdrawn / abandoned Gray, KSSPP Apr 2015target 2016
Solar project AB1-168, Camden County
Solar
4.5 MWWithdrawn / abandoned Camden, NJPJM Oct 2015target 2017
Boykins Solar
Solar
4.5 MWWithdrawn / abandoned Southampton, VAPJM Mar 2015target 2017
Solar project 499, Malheur County
Solar
4.4 MWWithdrawn / abandoned Malheur, ORWest May 2015
Thornton Solar Facility
Solar
4.4 MWWithdrawn / abandoned Washington, MDPJM Nov 2015target 2017
Westmoreland Landfill Project
Other
4.0 MWWithdrawn / abandoned Westmoreland, PAPJM Aug 2015target 2017
Solar project AA2-147, Dorchester County
Solar
4.0 MWWithdrawn / abandoned Dorchester, MDPJM Apr 2015target 2016
Solar project AA2-168, Prince George's County
Solar
4.0 MWWithdrawn / abandoned Prince George's, MDPJM Apr 2015target 2016
Solar project 490, Malheur County
Solar
4.0 MWWithdrawn / abandoned Malheur, ORWest Apr 2015
Solar project AA2-153, Frederick County
Solar
4.0 MWWithdrawn / abandoned Frederick, MDPJM Apr 2015target 2016
Solar project AA2-084, Washington County
Solar
4.0 MWWithdrawn / abandoned Washington, MDPJM Mar 2015target 2016
Solar project AA2-155, Washington County
Solar
4.0 MWWithdrawn / abandoned Washington, MDPJM Apr 2015target 2016
Solar project AA2-143, Frederick County
Solar
4.0 MWWithdrawn / abandoned Frederick, MDPJM Apr 2015target 2016
Solar project AB1-032, Athens County
Solar
3.3 MWWithdrawn / abandoned Athens, OHPJM Jul 2015target 2016
Solar project 679, Iron County
Solar
3.3 MWWithdrawn / abandoned Iron, UTWest Jun 2015target 2016
Solar project 678, Iron County
Solar
3.3 MWWithdrawn / abandoned Iron, UTWest Jun 2015target 2016
Other project 722, Salt Lake County
Other
3.2 MWWithdrawn / abandoned Salt Lake, UTWest Nov 2015target 2016
Lake County Generating Station
Other
3.1 MWWithdrawn / abandoned Lake, OHPJM Oct 2015target 2017
Solar
Solar
3.1 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2015target 2017
Solar project 228, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Nov 2015target 2016
Solar project 240, Gallatin County
Solar
3.0 MWWithdrawn / abandoned Gallatin, MTWest Dec 2015target 2016
Solar project 237, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Dec 2015target 2016
Solar project 184, Missoula County
Solar
3.0 MWWithdrawn / abandoned Missoula, MTWest Feb 2015target 2016
Solar project 724, Douglas County
Solar
3.0 MWWithdrawn / abandoned Douglas, ORWest Dec 2015target 2017
Solar project 200, Broadwater County
Solar
3.0 MWWithdrawn / abandoned Broadwater, MTWest Feb 2015target 2016
Solar project 187, Lewis And Clark County
Solar
3.0 MWWithdrawn / abandoned Lewis And Clark, MTWest Feb 2015target 2016
Solar project 239, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Dec 2015target 2016
Solar project 219, Lewis And Clark County
Solar
3.0 MWWithdrawn / abandoned Lewis And Clark, MTWest Nov 2015target 2020
Solar project 232, Cascade County
Solar
3.0 MWWithdrawn / abandoned Cascade, MTWest Nov 2015target 2020
Solar project 217, Silver Bow County
Solar
3.0 MWWithdrawn / abandoned Silver Bow, MTWest Nov 2015target 2016
Solar project 191, Deer Lodge County
Solar
3.0 MWWithdrawn / abandoned Deer Lodge, MTWest Feb 2015target 2016
Solar project 180, Yellowstone County
Solar
3.0 MWWithdrawn / abandoned Yellowstone, MTWest Jan 2015target 2015
Solar project 190, Deer Lodge County
Solar
3.0 MWWithdrawn / abandoned Deer Lodge, MTWest Feb 2015target 2016
Solar project 505, Baker County
Solar
3.0 MWWithdrawn / abandoned Baker, ORWest Oct 2015
Solar project 716, Douglas County
Solar
3.0 MWWithdrawn / abandoned Douglas, ORWest Nov 2015target 2016
Solar project 709, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Sep 2015target 2016
Solar project 182, Yellowstone County
Solar
3.0 MWWithdrawn / abandoned Yellowstone, MTWest Feb 2015target 2015
Solar project 212, Cascade County
Solar
3.0 MWWithdrawn / abandoned Cascade, MTWest Nov 2015target 2016
Solar project 199, Broadwater County
Solar
3.0 MWWithdrawn / abandoned Broadwater, MTWest Feb 2015target 2016
Solar project 192, Deer Lodge County
Solar
3.0 MWWithdrawn / abandoned Deer Lodge, MTWest Feb 2015target 2016
Solar project 183, Yellowstone County
Solar
3.0 MWWithdrawn / abandoned Yellowstone, MTWest Feb 2015target 2015
Solar project 227, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Nov 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)