OTHER Β· PJMLake County Generating Station
Lake County Generating Station is a 3.1 MW other request withdrawn in the PJM interconnection queue, in Lake County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedFeb 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-115
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Painesville 13kV
- Location
- Lake County, Ohio
- Technology
- Other: 3.1 MW
- Total requested
- 3.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 28 October 2015
- Proposed online date
- December 2017
- Withdrawn
- February 2017
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Other requests in Lake County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem