United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pisces Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Sageberry Solar Solar + storage |
404 MW | Withdrawn / abandoned |
| Aquarius Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Jaciva Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Garces Hybrid Solar Solar + storage |
403 MW | Withdrawn / abandoned |
| Agua Amarga Wind Onshore wind |
403 MW | Withdrawn / abandoned |
| DRY Grape Hybrid Solar Solar + storage |
403 MW | Withdrawn / abandoned |
| Vista Power Project Gas |
402 MW | Withdrawn / abandoned |
| North Highland Solar + storage |
401 MW | Withdrawn / abandoned |
| Sheep Mountain Solar + storage |
401 MW | Withdrawn / abandoned |
| Hyder Valley Farms Solar + storage |
401 MW | Withdrawn / abandoned |
| Box Ranch 1 Solar + storage |
401 MW | Withdrawn / abandoned |
| East Mule Solar + storage |
401 MW | Withdrawn / abandoned |
| Box Ranch 2 Solar + storage |
401 MW | Withdrawn / abandoned |
| Shadow Hills Solar + storage |
401 MW | Withdrawn / abandoned |
| Sandy Valley Solar + storage |
401 MW | Withdrawn / abandoned |
| Ulatis Creek Solar + storage |
401 MW | Withdrawn / abandoned |
| Signal Peak Solar |
400 MW | Withdrawn / abandoned |
| Hickory Solar Farm Solar |
400 MW | Withdrawn / abandoned |
| Jean Lake Solar Solar |
400 MW | Withdrawn / abandoned |
| Canella 2 Solar Farm Solar + storage |
400 MW | Withdrawn / abandoned |
| Siberia Phase I Segs (Fka DPT Broadwell Lake II) Solar |
400 MW | Withdrawn / abandoned |
| Yellow Hay Hybrid Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| DPT Broadwell Lake Solar |
400 MW | Withdrawn / abandoned |
| Lotus 3 Battery storage |
400 MW | Withdrawn / abandoned |
| Collomia Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Lakey Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| Hydrogen Energy California Gas |
400 MW | Withdrawn / abandoned |
| Silkie Battery storage |
400 MW | Withdrawn / abandoned |
| Amboy Onshore wind |
400 MW | Withdrawn / abandoned |
| Idris Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Patterson Pass GT Project Gas |
400 MW | Withdrawn / abandoned |
| Desert Jasper PV Solar |
400 MW | Withdrawn / abandoned |
| Kramm Battery storage |
400 MW | Withdrawn / abandoned |
| Palo Verde Energy Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Pavion Battery storage |
400 MW | Withdrawn / abandoned |
| Fitzgibbons Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| Wellhead Power Kern 3 Gas |
400 MW | Withdrawn / abandoned |
| Star Generation Gas |
400 MW | Withdrawn / abandoned |
| Panoche Valley Solar Farm Expansion Solar |
400 MW | Withdrawn / abandoned |
| Nevada Mohave Solar Solar |
400 MW | Withdrawn / abandoned |
| Siberia Phase II Segs (Fka DPT 9) Solar |
400 MW | Withdrawn / abandoned |
| CPV California II Gas |
400 MW | Withdrawn / abandoned |
| Soldier Flat Onshore wind |
400 MW | Withdrawn / abandoned |
| Fountain Hybrid Solar + storage |
393 MW | Withdrawn / abandoned |
| Eastside Plains Energy Center Solar + storage |
393 MW | Withdrawn / abandoned |
| Birds Landing Energy Center Gas |
391 MW | Withdrawn / abandoned |
| Solano Energy Center Gas |
390 MW | Withdrawn / abandoned |
| Desert Butte Solar Farm Solar |
387 MW | Withdrawn / abandoned |
| Rancheros Energy Center Solar + storage |
387 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)