WIND Β· OPERATIONAL

Tallentire Wind Farm (GB)

Tallentire Wind Farm (GB) is a 12 MW onshore wind farm in North West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North West
  • England
Project stageOperating
  1. PlanningMar 2008 (completed)
  2. ConsentedFeb 2011 (completed)
  3. ConstructionJul 2012 (completed)
  4. OperatingJul 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CA13 0QA
Coordinates
54.7069, -3.3595

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Tallentire Wind Farm (GB) compares

305th of 488largest wind farms in the UK register
16th of 32in North West
0.04%of listed UK wind farms capacity
β‰ˆ 27 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 10,120 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Tallentire Hill
Developer / operator
The Renewables Infrastructure Group (TRIG)
Planning authority
Cumberland
Planning reference
2/2008/0261
Application submitted
19 March 2008
Permission granted
4 February 2011
Construction started
6 July 2012
Began operating
9 July 2013
Capacity in planning record
12 MW
Address
Hill Farm, Cockermouth, Cumbria. CA13 0PY, Cumbria
REPD reference
4104

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.