WIND Β· OPERATIONAL

Winscales Moor

Winscales Moor is a 5.95 MW onshore wind farm in North West England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North West
  • England
Project stageOperating
  1. PlanningOct 2006 (completed)
  2. ConsentedJun 2007 (completed)
  3. ConstructionDec 2008 (completed)
  4. OperatingMay 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.95 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
WPO UK Services
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
54.6423, -3.4968

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Winscales Moor compares

404th of 488largest wind farms in the UK register
26th of 32in North West
0.02%of listed UK wind farms capacity
β‰ˆ 14 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 5.95 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,020 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Gravis Capital Management
Planning authority
Cumberland
Planning reference
2/2006/1321
Application submitted
1 October 2006
Permission granted
20 June 2007
Construction started
1 December 2008
Began operating
1 May 2009
Capacity in planning record
6 MW
Address
Winscales Moor, Cumbria
REPD reference
2986

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.