WIND Β· OPERATIONAL

Wythegill

Wythegill is a 2.3 MW onshore wind farm in North West England, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North West
  • England
Project stageOperating
  1. PlanningApr 2011 (completed)
  2. ConsentedOct 2012 (completed)
  3. ConstructionMar 2015 (completed)
  4. OperatingJun 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
2.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Capital Dynamics UK
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CA14 1SA
Coordinates
54.6741, -3.5231

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wythegill compares

463rd of 488largest wind farms in the UK register
32nd of 32in North West
0.01%of listed UK wind farms capacity
β‰ˆ 5.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 2.3 MW station would generate roughly 5.2 GWh of electricity in a year, similar to the annual use of about 1,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by Capital Dynamics UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wythegill Wind Turbine
Developer / operator
Airvolution Energy
Planning authority
Cumberland
Planning reference
2/2011/0259
Application submitted
14 April 2011
Permission granted
11 October 2012
Construction started
15 March 2015
Began operating
15 June 2015
Capacity in planning record
2.3 MW
Address
Land at Wythegill Syke, Seaton, Workington, Cumbria, Cumbria, CA15 8RX
REPD reference
3832

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source