πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Robin Rigg East

Robin Rigg East is a 84 MW offshore wind farm in Scotland, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Scotland
Project stageOperating
  1. PlanningJun 2002 (completed)
  2. ConsentedJun 2003 (completed)
  3. ConstructionDec 2006 (completed)
  4. OperatingApr 2010 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
84 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
RWE Npower
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
54.7642, -3.6955

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Robin Rigg East compares

68th of 488largest wind farms in the UK register
30th of 199in Scotland
0.29%of listed UK wind farms capacity
β‰ˆ 280 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 84 MW station would generate roughly 280 GWh of electricity in a year, similar to the annual use of about 103,560 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
E.ON UK
Planning authority
Scottish Government (S36)
Application submitted
14 June 2002
Permission granted
16 June 2003
Construction started
1 December 2006
Began operating
28 April 2010
Capacity in planning record
84 MW
Address
9.5km Maryport/8.5km off Rock CliffeΒ , Offshore
REPD reference
2496

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.