Upper Farringdon
Upper Farringdon is a 6.18 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 6.18 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- GU34 3HW
- Coordinates
- 51.1142, -0.9804
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Upper Farringdon compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.18 MW station would generate roughly 5.4 GWh of electricity in a year, similar to the annual use of about 2,010 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Octopus InvestmentsNearby generating sites
- Wilsom Farm Β· 4.01 MW solar farm3.6 km
- Upper Farm Β· 10 MW solar farm10.2 km
- Bishops Sutton Β· 12 MW solar farm12.4 km
- Hungerford Β· 4.47 MW solar farm19.7 km
- Lovedean Β· 4.54 MW solar farm22.8 km
- Hill End Farm Β· 2.84 MW solar farm23.8 km
- Berry Court Β· 3.92 MW solar farm25.6 km
- Overton Β· 3.75 MW solar farm25.7 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Barley Wood Farm Lane
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- East Hampshire
- Planning reference
- 54507/002
- Application submitted
- 9 December 2013
- Permission granted
- 31 March 2014
- Construction started
- 1 January 2015
- Began operating
- 20 March 2015
- Capacity in planning record
- 5.4 MW
- Address
- Land South of, Gaston Lane, Farringdon, Alton, Hampshire, GU34 3EE
- REPD reference
- 1474
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026