Lovedean
Lovedean is a 4.54 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 4.54 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PO8 0SH
- Coordinates
- 50.9121, -1.0341
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Lovedean compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.54 MW station would generate roughly 4.0 GWh of electricity in a year, similar to the annual use of about 1,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Octopus InvestmentsNearby generating sites
- Raglington Farm Solar Park Β· 5.73 MW solar farm13.9 km
- Fareham Β· 20.5 MW solar farm14.5 km
- Bishops Sutton Β· 12 MW solar farm20.7 km
- Netley Β· 5 MW solar farm21.7 km
- Upper Farringdon Β· 6.18 MW solar farm22.8 km
- Merston Β· 5 MW solar farm23.7 km
- Ferry Farm Β· 4.92 MW solar farm24.5 km
- Hill Farm (OI) Β· 10.8 MW solar farm24.8 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Lovedean Farm
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- East Hampshire
- Planning reference
- 54495/001
- Application submitted
- 2 October 2012
- Permission granted
- 24 December 2012
- Began operating
- 28 March 2013
- Capacity in planning record
- 4.5 MW
- Address
- Day Lane, Horndean, Waterlooville, Hampshire, PO8 0SH, Hampshire
- REPD reference
- 1449
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.