Sharland Farm

Sharland Farm is a 2.77 MW solar farm in South West England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningMar 2015 (completed)
  2. ConsentedJul 2015 (completed)
  3. ConstructionDec 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
2.77 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EX17 6SJ
Coordinates
50.8351, -3.7781

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Sharland Farm compares

588th of 662largest solar farms in the UK register
158th of 192in South West
0.05%of listed UK solar farms capacity
β‰ˆ 2.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 2.77 MW station would generate roughly 2.4 GWh of electricity in a year, similar to the annual use of about 900 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Sharland Solar Farm
Developer / operator
Lightsource Renewable Energy
Planning authority
Mid Devon
Planning reference
15/00537/MFUL
Application submitted
31 March 2015
Permission granted
8 July 2015
Construction started
19 December 2016
Began operating
4 March 2017
Capacity in planning record
2.8 MW
Address
Land at (Sharland Farm), Morchard Bishop, Crediton, Devon, Devon, EX17 6SJ
REPD reference
5152

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.