Copley Wood (Renewables (SW))
Copley Wood (Renewables (SW)) is a 1.5 MW solar farm in South West England, operated by Atmosclear. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 1.5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Atmosclear
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 51.0880, -2.6890
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Copley Wood (Renewables (SW)) compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 1.5 MW station would generate roughly 1.3 GWh of electricity in a year, similar to the annual use of about 490 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AtmosclearNearby generating sites
- Manor Farm Β· 4.87 MW solar farm3.9 km
- Somerton Door Β· 8.7 MW solar farm5.3 km
- Whitley (Ashcott Farm) Solar Park Β· 7.57 MW solar farm8.8 km
- Southfield Β· 9.76 MW solar farm9.8 km
- Chilton Cantelo Solar park Β· 5 MW solar farm12.0 km
- Crapnell Farm Β· 4.67 MW solar farm15.5 km
- Pitts Farm Β· 3.21 MW solar farm15.7 km
- New Row Farm Β· 4.45 MW solar farm17.1 km
Also operated by Atmosclear
Atmosclear operates 9 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.