Capel Grange Solar Energy Ltd
Capel Grange Solar Energy Ltd is a 4.08 MW solar farm in South East England, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 4.08 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Engie Power
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TN12 6QX
- Coordinates
- 51.1788, 0.3627
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Capel Grange Solar Energy Ltd compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.08 MW station would generate roughly 3.6 GWh of electricity in a year, similar to the annual use of about 1,320 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Engie PowerNearby generating sites
- Hadlow Place Β· 18.9 MW solar farm2.5 km
- Widehurst Β· 4.99 MW solar farm10.4 km
- Lenham Β· 6.61 MW solar farm24.9 km
- Horam Β· 8.12 MW solar farm28.9 km
- New Kaine Β· 1.87 MW solar farm29.1 km
- Bobbing Β· 11.6 MW solar farm30.1 km
- Horam Solar Park Β· 2.57 MW solar farm30.3 km
- Oaklands Β· 6.85 MW solar farm31.1 km
Also operated by Engie Power
Engie Power operates 11 sites in the register. Largest first:
- Dinorwig Power Station Β· pumped-storage station1,800 MW
- Ffestiniog Power Station Β· pumped-storage station360 MW
- Scotia Wind (Craigengelt) Ltd Β· onshore wind farm20 MW
- Sober Hill Wind Farm Ltd Β· onshore wind farm12.3 MW
- Blantyre Muir Wind Energy Ltd Β· onshore wind farm12.3 MW
- Cairnborrow Wind Energy Ltd Β· onshore wind farm10.3 MW
- Barlockhart Moor Wind Energy Ltd Β· onshore wind farm8.2 MW
- Carsington Wind Energy Ltd Β· onshore wind farm8.2 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Capel Grange Solar Park
- Developer / operator
- West Coast Energy
- Planning authority
- Tunbridge Wells
- Planning reference
- 14/506168/FULL
- Application submitted
- 12 December 2014
- Permission granted
- 10 April 2015
- Construction started
- 1 November 2015
- Began operating
- 31 March 2016
- Capacity in planning record
- 6.6 MW
- Address
- OS Plot 8200, Badsell Road, Five Oak Green, Tonbridge, Kent
- REPD reference
- 4936
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.