SOLAR Β· OPERATIONAL

Capel Grange Solar Energy Ltd

Capel Grange Solar Energy Ltd is a 4.08 MW solar farm in South East England, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningDec 2014 (completed)
  2. ConsentedApr 2015 (completed)
  3. ConstructionNov 2015 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.08 MW
Status
Operational
Technology
Solar Β· PV
Operator
Engie Power
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TN12 6QX
Coordinates
51.1788, 0.3627

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Capel Grange Solar Energy Ltd compares

527th of 662largest solar farms in the UK register
85th of 105in South East
0.07%of listed UK solar farms capacity
β‰ˆ 3.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.08 MW station would generate roughly 3.6 GWh of electricity in a year, similar to the annual use of about 1,320 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Engie Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Capel Grange Solar Park
Developer / operator
West Coast Energy
Planning authority
Tunbridge Wells
Planning reference
14/506168/FULL
Application submitted
12 December 2014
Permission granted
10 April 2015
Construction started
1 November 2015
Began operating
31 March 2016
Capacity in planning record
6.6 MW
Address
OS Plot 8200, Badsell Road, Five Oak Green, Tonbridge, Kent
REPD reference
4936

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026