πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Horam

Horam is a 8.12 MW solar farm in South East England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningAug 2014 (completed)
  2. ConsentedSep 2014 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.12 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TN21 0JB
Coordinates
50.9313, 0.2377

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Horam compares

174th of 662largest solar farms in the UK register
36th of 105in South East
0.14%of listed UK solar farms capacity
β‰ˆ 7.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 8.12 MW station would generate roughly 7.1 GWh of electricity in a year, similar to the annual use of about 2,630 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Vogt Solar
Planning authority
Wealden
Planning reference
WD/2014/1642
Application submitted
7 August 2014
Permission granted
19 September 2014
Construction started
1 January 2015
Began operating
31 March 2015
Capacity in planning record
8.1 MW
Address
Land AND WEST OF HORAM MANOR, HORAM, East Sussex, TN21 0YD
REPD reference
2169

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.