Project stageOperating
  1. PlanningJun 2014 (completed)
  2. ConsentedJul 2015 (completed)
  3. ConstructionSep 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.78 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BN8 6PT
Coordinates
50.9335, 0.1108

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bentley Estate compares

466th of 662largest solar farms in the UK register
77th of 105in South East
0.08%of listed UK solar farms capacity
β‰ˆ 4.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.78 MW station would generate roughly 4.2 GWh of electricity in a year, similar to the annual use of about 1,550 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Lightsource Renewable Energy
Planning authority
Wealden
Planning reference
WD/2014/1245/MAJ
Application submitted
20 June 2014
Permission granted
23 July 2015
Construction started
23 September 2015
Began operating
17 December 2015
Capacity in planning record
5 MW
Address
BENTLEY ESTATE, UCKFIELD, EAST SUSSEX, TN22 5QP, East Sussex
REPD reference
2132

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.