NESO TEC REGISTER Β· GREAT BRITAIN

Interconnector projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2332.8 GW in total
In planning23scoping or awaiting consent
Consented or building1closest to connecting
Built11connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

23 projects
ProjectCapacityStageConnection siteFrom
Aquind Interconnector
Interconnector Β· Aquind Limited
2.1 GWAwaiting Consents Lovedean 400kV Substation
National Grid (England & Wales)
Jun 2030
Alverdiscott
Interconnector Β· Xlinks 1 Ltd
1.8 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Aug 2030
Alverdiscott 2
Interconnector Β· Xlinks 1 Ltd
1.8 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Aug 2032
Continental Link
Interconnector Β· National Grid Interconnector Holdings Limited
1.8 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2035
GB-EU MPI
Interconnector Β· Windgrid
1.8 GWScoping Fiddes 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Teeside MPI
Interconnector Β· National Grid Interconnector Holdings Limited
1.8 GWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
The Superconnection
Interconnector Β· Asc Energy plc
1.8 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2037
LionLink (EuroLink)
Interconnector Β· National Grid Interconnector Holdings Limited
1.6 GWScoping Friston 400kV Substation
National Grid (England & Wales)
Oct 2032
Celtic MPI
Interconnector Β· National Grid Interconnector Holdings Limited
1.5 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2037
Gridlink Interconnector
Interconnector Β· Gridlink Interconnector Limited
1.5 GWScoping Kingsnorth 400kV Substation
National Grid (England & Wales)
Mar 2029
Nautilus
Interconnector Β· National Grid Interconnector Holdings Limited
1.5 GWScoping Wallend 400kV Substation
National Grid (England & Wales)
Oct 2029
Western MPI
Interconnector Β· National Grid Interconnector Holdings Limited
1.5 GWScoping Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2037
Cronos
Interconnector Β· Cronos Energy Ltd
1.4 GWScoping Kemsley 400kV Substation
National Grid (England & Wales)
Oct 2029
Low Carbon Link
Interconnector Β· Low Carbon Solar Park 39 Limited
1.4 GWScoping South Wales West Connection Node C 400Kv Substation
National Grid (England & Wales)
Oct 2037
NorthConnect
Interconnector Β· Northconnect Limited
1.4 GWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Mar 2030
Tarchon
Interconnector Β· Tarchon Energy Limited
1.4 GWScoping East Anglia Connection Node 400kV Substation
National Grid (England & Wales)
Oct 2030
FAB Link Interconnector
Interconnector Β· FAB Link Limited
1.3 GWAwaiting Consents Exeter 400kV Substation
National Grid (England & Wales)
Sep 2032
Seneca
Interconnector Β· Frontier Power International Limited
1.3 GWScoping Mablethorpe 400kV Substation
National Grid (England & Wales)
Nov 2031
Project Cobalt
Interconnector Β· Getlink Projects 2 Limited
1.1 GWScoping East Kent Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2036
The Superconnection
Interconnector Β· Asc Energy plc
1.0 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2032
Mares
Interconnector Β· Maresconnect Limited
750 MWAwaiting Consents Bodelwyddan 400kV Substation
National Grid (England & Wales)
Jun 2030
Kulizumboo Interconnector
Interconnector Β· Kulizumboo Limited
700 MWScoping Canterbury 400kV GIS Substation
National Grid (England & Wales)
Apr 2031
LIRIC Interconnector
Interconnector Β· TI LIRIC Limited
700 MWScoping Hunterston East 400kV
SP Transmission (south Scotland)
Oct 2032

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.