Other projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown164.9 GW in total
In planning7scoping or awaiting consent
Consented or building15closest to connecting
Built16connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

16 projects
ProjectCapacityStageConnection siteFrom
Drax Power Station
Other Β· Drax Power Limited
3.9 GWBuilt Drax 400kV Substation
National Grid (England & Wales)
Lynemouth Power Station
Other Β· Lynemouth Power Limited
396 MWBuilt Blyth GSP
National Grid (England & Wales)
Tees Renewable Energy Plant
Other Β· Mgt Teesside Limited
285 MWBuilt Teeside Connection Node A 132kV Substation
National Grid (England & Wales)
Indaver Rivenhall IWMF
Other Β· Indaver Rivenhall Limited
55 MWBuilt Braintree GSP
National Grid (England & Wales)
Markinch (Rothes) Biomass CHP Plant
Other Β· Rwe Markinch Limited
55 MWBuilt Glenrothes GSP
SP Transmission (south Scotland)
Tilbury
Other Β· Tilbury Green Power Limited
43 MWBuilt Tilbury 132kV Substation
National Grid (England & Wales)
Thetford
Other Β· Epr Thetford Limited
41 MWBuilt Bramford 400kV Substation
National Grid (England & Wales)
Burwell
Other Β· Energy Power Resources Limited
38 MWBuilt Burwell GSP
National Grid (England & Wales)
Peak Gen Makro Exeter
Other Β· Peak Gen Power 14 Limited
20 MWBuilt Exeter 132kV Substation
National Grid (England & Wales)
Glanford
Other Β· Epr Glanford Limited
15 MWBuilt Keadby GSP
National Grid (England & Wales)
Beatrice Sync Comp
Other Β· Tinz Programme 1 Projectco 3 Limited
0 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
Gretna Synchronous Compensation
Other Β· Gretna Grid Services Limited
0 MWBuilt Gretna 400/132kV
SP Transmission (south Scotland)
Lister Drive 275kV
Other Β· Lister Drive Solutions Limited
0 MWBuilt Lister Drive 275kV Substation
National Grid (England & Wales)
Mersey Reactive 1
Other Β· Mersey Reactive Power Limited
0 MWBuilt Frodsham (Network Rail) GSP
National Grid (England & Wales)
Rothienorman Sync Comp
Other Β· Rothienorman Grid Services Limited
0 MWBuilt Rothienorman 400kV Substation
SSEN Transmission (north Scotland)
Thurso South Synchronous Compensation
Other Β· Thurso Grid Services Limited
0 MWBuilt Thurso GSP
SSEN Transmission (north Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.