πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Other

OTHER Β· NGET

Indaver Rivenhall IWMF

Indaver Rivenhall IWMF is a 55 MW other project built and connected, connecting to the National Grid (England & Wales) network at Braintree GSP. The connection agreement is held by Indaver Rivenhall Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006457
Customer
Indaver Rivenhall Limited
Technology
Waste
Total capacity
55 MW
Already connected
55 MW
Connection site
Braintree GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Braintree GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem